Installing HMPE rope on a winch drum

How to install a new Dyneema® or HMPE winch line: dead wraps, back tension, removing constructional stretch, fleet angle and the problems to avoid.

Winch drum spooled with synthetic rope
A synthetic winch line spooled neatly under tension.

Synthetic rope behaves differently on a drum than steel wire. It is softer, it stretches more under load and HMPE has a low friction coefficient. The steps below help you install a new HMPE line so that it lasts and performs as intended.

1. Unreel without twist

Pay the rope out from a turntable, or put a pipe through the reel so it can turn freely. Never pull rope off a reel lying on its side. Twist costs strength: in a new 12-strand rope, two turns per metre reduce the breaking load by about 10%.

2. Enough dead wraps on the drum

Because synthetic rope deforms under load, a clamp on the drum flange cannot hold it on its own. The load must be carried by friction of the turns on the drum. For HMPE, keep at least 10 full dead wraps on the drum at all times; for other synthetic ropes, 6 turns is usually enough. A spooling device is strongly recommended.

3. Spool on under back tension

The first time you spool a new line on, keep it under tension: about 5–10% of the minimum breaking load (MBL). This prevents the rope from slipping and stops the top layers from cutting into the layers below.

≤ 1.5°Drum
Keep the fleet angle between the drum and the first sheave or fairlead small: 1.5° or less.

4. Take out the constructional elongation

New synthetic rope has built-in constructional stretch that should be removed before real work. Ideally, spool the rope about five times at a high load of 20–25% of MBL. On a tug, a practical way is to make the line fast to a bollard, move away and come back while the winch hauls in under good line pull.

5. Keep the fleet angle small

Use roughly the same limits as for steel wire: a fleet angle of 1.5° or less. A larger angle causes the rope to rub against itself and the flanges, and spools unevenly.

6. Smooth contact surfaces

Every surface the rope touches should be smooth and clean. Polished stainless steel is common on drums, fairleads and rollers. Low friction means less abrasion and less heat build-up.

Watch out for these two problems
  • Cross-over points: where the rope crosses the turn below, it is bent over a diameter equal to its own and can be damaged.
  • Diving or burying: under very high load the rope can pull down into the layers below, especially if it was spooled on slack and is paid out under high load. A buried synthetic rope can usually be freed without damage, but always inspect it afterwards.

7. Drum capacity and flange loads

Soft synthetic rope fills the gaps between turns and layers. You can therefore store more length on the same drum than with steel wire, typically 10–30% more even on eight layers of heat-set rope. The same effect puts more pressure on the drum flanges, so check the drum design.

8. In operation

High line pull increases stress at cross-over points and causes rope-on-rope sliding and wear. When you haul in, keep enough back tension on the drum: like steel wire, at least 10% of MBL. If you doubt whether a rope is suitable for the intended load, do not use it.

9. Repair a damaged cover straight away

If a rope has a non-load-bearing cover and the cover is damaged, repair it before further use, preferably with a thin, abrasion-resistant line that has some stretch, such as polyester or nylon.

Quick checklist
  1. Reel on a turntable or free-running shaft, no twist.
  2. At least 10 dead wraps for HMPE.
  3. First spool at 5–10% of MBL.
  4. Remove constructional stretch: about 5 spools at 20–25% of MBL.
  5. Fleet angle 1.5° or less.
  6. Smooth, clean contact surfaces.
  7. Haul in at 10% of MBL or more.