Glossary: rope and mooring terms explained

The key terms around rope, strength and mooring explained in plain language: from MBL and LDBF to creep, D/d and snap-back.

Breaking load (BL)
The force at which a rope breaks under straight tension, given in kN or tonnes.
MBL (minimum breaking load)
The guaranteed minimum breaking load of a new, dry rope. Selection and working load are based on this figure.
Spliced breaking load / LDBF
Line Design Break Force: the breaking load of the rope with spliced eyes, tested as it is used on board. For 12-strand rope usually about 10% lower than the MBL of the rope itself.
Ship design MBL (MBLSD)
The minimum breaking load for which a vessel’s bollards, fairleads, winches and hull structure are designed. New mooring lines should have an LDBF of 100–105% of this value.
TDBF
Tail Design Break Force: the breaking load of a tail including splices, as stated by the manufacturer.
Working load (WLL / SWL)
The maximum load a rope or fitting may see in normal use. For mooring lines, a rule of thumb is a working load of no more than half the LDBF, and for a long service life a normal operating load of around 20–25% of the MBL.
Safety factor
The ratio between breaking load and working load. See the rope calculator for common values per application.
Elongation
How much a rope lengthens under load, in percent. Elongation at break is the stretch at the moment of failure.
Modulus
The stiffness of a fibre or rope: the higher the modulus, the less it stretches under the same load. HMPE has a very high modulus.
Creep
Slow, permanent lengthening of a rope under constant load. Mainly relevant for HMPE under long-term load.
Fatigue
Weakening caused by repeated loading and unloading, or by bending over rollers and bollards. Often caused by internal abrasion.
Shock load
A sudden, rapid rise in load, for example from swell or a passing ship. A rope visibly damaged by a shock load must be retired immediately.
D/d ratio
The diameter of the roller, bollard or fairlead (D) divided by the rope diameter (d). The smaller D/d, the more strength the rope loses through bending.
Geometric factor
Factor used to calculate the load on a fitting from the line tension and the angle the rope wraps around it.
Snap-back
The dangerous recoil of a rope that breaks under tension. Elastic ropes recoil with more energy; always stay out of the snap-back zone.
Tail
A short, elastic length of rope at the end of a mooring line. The tail absorbs shock loads, takes most of the wear and is cheap to replace.
Mixed mooring
Using mooring lines with very different stretch side by side in the same direction. Not recommended: the stiffest line then takes almost all the load.
dtex
Measure of fibre or yarn thickness: the weight in grams per 10,000 metres.
HT and HM
High tenacity (polyester, polyamide, polyolefin) and high modulus (HMPE, aramid). See fibres and materials.
Qualified person
Someone qualified by training, certificate or proven experience to inspect mooring lines and decide on retirement.
Certificate 2.2, 3.1, 3.2
Certificate types under EN 10204: 2.2 confirms the rope meets the order, 3.1 shows break tests on the production batch, and for 3.2 an independent inspection body witnesses the test.