Inspection, logbook and marking of mooring lines
When and by whom mooring lines are inspected, what to look for, what to record and how to mark lines, following SOLAS and OCIMF MEG4.
Regular inspection and proper records are the basis of safe mooring. Since 2024, SOLAS (MSC.1/Circ.1620) requires vessels to manage inspection and maintenance of mooring equipment, including the lines, in a documented way. For tankers and terminals, OCIMF MEG4 sets even stricter requirements.
When to inspect?
| When | By whom | What |
|---|---|---|
| Before and during every use | Mooring crew | Visual check for damage; anything unusual in the logbook |
| Monthly | Crew | Routine inspection of all lines |
| After 250 hours of use or 6 months (whichever first) | Qualified person | Walk the full length of line and tail, assess and record (OCIMF MEG4) |
Extra inspection straight away after
- a suspected heavy shock load;
- audible “cracking” of the line;
- contact with chemicals;
- unexpectedly strong twisting;
- external mechanical damage.
In these cases a qualified person must assess the line immediately.
What to look for
Walk the full length of the rope, paying extra attention to contact points with fairleads and the crossing point on split drums:
- abrasion and cuts;
- kinks, twist and deformation;
- uneven diameter;
- glossy or glazed areas;
- discolouration;
- compressed areas;
- broken strands or yarns;
- heat deformation;
- damage to splices;
- heavy wear or breakdown of the structure.
For assessment per construction, see assessing wear.
What to record
Give every line a unique number (the lot number) and keep the original certificates on board. A simple record per line:
| Position on board | Lot no. | Material | Diameter (mm) | Length (m) | LDBF (t) | Certificate no. | Purchased | Installed |
|---|---|---|---|---|---|---|---|---|
| Head line 1 | … | … | … | … | … | … | … | … |
| Spring 1 | … | … | … | … | … | … | … | … |
And at every inspection or maintenance:
| Date | Lot no. | Qualified person | Hours in service | Side in use (A/B) | Location of damage | Action |
|---|---|---|---|---|---|---|
| … | … | … | … | … | … | … |
Also record when a line has been turned or rotated.
Marking and identification
Mark every line at both ends (side A and B), with a label, a coloured whipping or an NFC tag. The rope should show: side A/B, length, LDBF and date of manufacture. That way it is always clear which line and which certificate you are dealing with during inspection and replacement.
Replacement
- Replace at 75% residual strength or after 10 years at most, in use or in storage.
- A new line should have an LDBF of 100–105% of the ship design MBL. See strength and standards.
- Check that the new line suits the existing fittings.
- Reasons to replace: compression fatigue, stiffness, failure or age.