Skip to content

Storage and care of rope and mooring lines

How to store rope properly, clean it without damage, and spread wear by turning and rotating mooring lines.

Well-stored and well-maintained rope lasts years longer. A few fixed habits on board and in storage get the most out of your mooring and winch lines.

Storage

  • Only store rope once it is completely dry.
  • Keep rope dry, well ventilated and dark, or covered on the drum.
  • Keep it away from heat sources and out of contact with chemicals, oil or paint.
  • Not on its original reel? Lay it in figure-of-eight layers so it does not twist.
  • Stand reels upright on their flanges; move reels over 30 kg with lifting equipment.
  • Mooring lines and tails left on a winch but not in use: cover them with a waterproof cover.
Never store a damaged rope

A damaged rope stored among good ropes will sooner or later be used by mistake. Mark it clearly and remove it, or have it repaired first.

Cleaning

If cleaning is needed, rinse with lukewarm running water only. This removes salt, sand and grit that cause wear from the inside. Do not use aggressive cleaning agents or a pressure washer, and let the rope dry naturally, away from direct heat.

End-for-ending and rotating

A mooring line wears hardest at a few fixed points: at the fairlead, on the bollard and at the crossing point of a split drum. Turning the rope end for end and swapping positions regularly spreads the wear over its whole length.

MeasureHow often
Turn the rope end for endat least every 6 months
Swap positions (e.g. head lines with springs)at least every 12 months

Record in the logbook when a rope was turned or swapped. See documentation and logbook.

Storage drumTension drumMin. 3 turns, HMPE 4–5Only 1 layer on the tension drumWatch the crossing point between drums
Split winch drum: one layer and enough turns on the tension drum.

On the winch

  • At least 3 turns on the tension side of a split drum, and 4–5 turns on the working part for HMPE.
  • Only one layer on the tension side of a split drum: two layers can seriously damage the rope.
  • See also installing HMPE on a winch.

Preparation before installation

Check everything the rope will touch: fairleads, rollers, bollards, drums and deck edges must be smooth, free of rust, burrs, grooves or sharp edges, and rollers must turn freely. Dragging a new rope over a rough surface costs service life straight away.

← Knowledge base

Questions about maintaining your lines? We are happy to help.