Mooring line strength: ship design MBL, LDBF and standards
How strong should a mooring line be? Ship design MBL, line design break force (LDBF), working load, the tail as weakest link, SOLAS and OCIMF MEG4, and certificates explained.
How strong should a mooring line be? On modern vessels this is no longer a matter of feel: the strength of the lines is linked to the bollards, winches and hull structure. This article explains the key terms and rules of thumb.
Ship design MBL: the starting point
For every vessel, the design stage calculates which forces the mooring lines must withstand, based on vessel size, hull form and the conditions alongside (wind, current, waves). The result is the ship design MBL (MBLSD): the minimum breaking load for which bollards, fairleads, winches and hull are designed. This value is in the vessel’s documentation.
What follows from the ship design MBL
| Item | Guide value |
|---|---|
| Spliced breaking load (LDBF) of new mooring lines | 100–105% of MBLSD |
| Winch brake design load | approx. 80% of MBLSD |
| Winch brake holding load | approx. 60% of MBLSD |
| Winch pull | approx. 20–33% of MBLSD |
| Tail under OCIMF MEG4 | 125–130% of MBLSD (spliced) |
A mooring line much stronger than the ship design MBL may look safer, but it is not: under overload a bollard or winch is then more likely to fail first, with far more serious consequences.
Working load and daily use
- As a rule of thumb, the safe working load of a mooring line is no more than 50% of the LDBF.
- For a long service life, normal loads are best kept around 20–25% of the MBL.
- Dynamic loads (swell, passing ships) should not exceed 50% of the LDBF.
The system: the weakest link
Main line, tail and connection are in series: the system can never hold more than its weakest part. Under OCIMF MEG4 the tail is stronger than the main line (to compensate for extra wear). Vessels not covered by MEG4 can choose to make the tail deliberately slightly weaker. If the system fails, it then does so near the quay, recoil on board is smaller and only the cheap tail is lost. See mooring systems and tails.
Which rules apply to your vessel?
| Rule | For whom | About |
|---|---|---|
| SOLAS, MSC.1/Circ.1175 Rev.1 | Vessels built from 2007 | Design of towing and mooring equipment |
| MSC.1/Circ.1619 | Vessels built from 2024 | Design of the mooring arrangement and selection of lines and fittings |
| MSC.1/Circ.1620 | All vessels in service from 2024 | Inspection and maintenance of mooring equipment, including lines |
| OCIMF MEG4 | Oil and gas tankers and their terminals | Extensive requirements for design, lines, testing and inspection |
Certificates
- 2.2: the rope meets the order; the data are based on measurements of that rope type.
- 3.1: the strength of the production batch has been proven by break tests.
- 3.2: as 3.1, with an independent inspection body witnessing.
- MEG4 certified: extensively tested to the requirements for tankers and terminals.
Keep the original certificates on board, linked to the unique number of each line. Use the rope calculator to quickly work out the diameter you need.